page 1
page 2
page 3
page 4 page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
< prev - next > Transport and infrastructure Animal transport KnO 100392_The Donkey Cart and Ambulance (Printable PDF)
Manufacturing the donkey cart and ambulance
Practical Action
4. These parts now need
to be arranged as in
diagram 2 where they
should be welded in
position. As can be seen
from this 4 pieces of Part
B should be cut at 45
degree angles.
5. The next stage is the
making of the 8 rim
clamps which will hold the
wheel rim. Firstly 8mm
clearance holes need to be
drilled and equal distance
apart (150 mm).
These holes will allow the jig
to make different size wheels.
Diagram 2. Plan view of wheel jig base
Part B cut at right
angle x4
Part A x1
Part B with two
straight end x 2
6. The heads of eight 20mm bolts
are cut off and the handles (Part G)
are welded at one end.
6. A 20 mm nut is then welded to
the end of the tube (Part H)
Diagram 3. A 3-D Model of one of the 8 wheel
rim clamps
Part G
Part H
Part F
Part E
7. Following this, Parts E and F are
welded together and then welded to
Part C (see tech drawing WJ – 02
for positioning dimensions).
Part D
Part I
Part C
8. The rim clamps are now ready to Diagram 4. A 3-D Model of the Hub Clamp
be screwed in place on the frame.
Obviously in the same position on
each leg although it will be quite
apparent if one is in the wrong
place.
9. The central locking bolt can
now be put in the centre of the
frame. First of all a hole is burned
in the metal with the welder that
allows the 30 mm threaded bar
(Part K) to fit inside. The
threaded bar is then welded in
position (90 degrees to the base).
Part L
(Note: K, L
and M are
welded
together)
Part K
Part M
4